Error Occured in Pages.SetPagesViewsbyid. Error Message: The transaction log for database 'TandC' is full due to 'LOG_BACKUP'. Al Ain Stadium & Mixed Use Development

Owner:

AAFAQ HOLDING

   

Consultants:

ARCHITECTURAL & ENGINEERING CONSULTANTS

   

Contractor:

Civil Engineering & Contracting Company WLL

   

Description

The development comprised housing (650 apartments in seven five-storey buildings), a commercial building, a multi-storey car park, a food and beverage souk and a 173-bed hotel with its own car park (managed by the Starwood hotel chain).

The project also comprised associated infrastructure such as roads, underground services and the high-quality public area. In total, the phase two works represent approximately 300,000 square metres of built-up area, all of which must achieved an Estidama 2 Pearl rating.